 1. Full Story Version (Detailed Case Study)

The Challenge

In late 2023, Highdorn/Freshwater issued a Section 20 notice for works to the rear sheds at Orford Court, quoting £110,000.

This came after over 20 years of shed neglect, leaving residents with no safe external storage. As a result, scooters and prams were left in communal hallways, which the agent then labelled as 'H&S breaches' — threatening leaseholders with removal costs.

The Approach

- I challenged the inflated Section 20: the true problem was freeholder neglect, not resident behaviour.
- After RTM took control in April 2024:
  • TD Construction were appointed to carry out the shed refurbishment at a realistic cost of £17,050 + VAT (£20,460).
  • Independent asbestos & waste survey was carried out by City Waste at a cost of £2,100.
- Total spend was £22,560, not £110,000.

The Outcome

- The inflated Section 20 was exposed as unreasonable.
- Actual shed refurbishment was achieved for a fraction of the cost.
- Leaseholders avoided over £87,000 in unnecessary charges.
- RTM also set a clear plan for future shed maintenance and safe resident storage.

The Saving

£110,000 quoted vs £22,560 actual. A saving of £87,440 across the block.

Client Reflection

Before: Leaseholders faced a £110k bill for neglected sheds and daily H&S threats.
After: RTM delivered transparency, cut costs by 80%, and restored safe, usable sheds.

2. Snapshot / Marketing Version

🏠 Orford Court – £110k Section 20 Cut to £22.5k

The Problem

- Freeholder/agent issued £110,000 Section 20 for shed & asbestos works.
- Residents forced to store items indoors due to shed neglect.

My Approach

✅ Challenged inflated quote.
✅ Took over via RTM (2024).
✅ Appointed TD Construction – £17,050 + VAT (£20,460).
✅ Independent asbestos/waste survey by City Waste – £2,100.

The Result

💷 Total actual cost: £22,560.
📊 £87,440 saved vs Section 20.
🔑 Safe, usable sheds restored.

Before → After

❌ £110k Section 20.
✅ £22.5k real cost – fair, transparent, and delivered.

3. Canva Flyer (Marketing Handout)

💡 Orford Court – £110k Section 20 vs £22.5k Actual
RTM Delivered Savings of £87,440

The Challenge

- Freshwater/Highdorn quoted £110,000 for sheds.
- 20+ years of neglect → unsafe storage indoors.

The Approach

✅ Appointed TD Construction: £17,050 + VAT (£20,460).
✅ Instructed City Waste for asbestos & waste: £2,100.
✅ Took control through RTM.

The Result

💷 £87,440 saved vs freeholder’s Section 20.
📈 Sheds refurbished at fair cost.
⚖️ Transparent, accountable process.

Before → After

❌ £110k inflated Section 20.
✅ £22.5k actual cost, properly managed.

Contact Me

📞 Maura Walsh
📧 [email protected] 
📱 07949 121641 

Stay connected with news and updates!

Join our mailing list to receive the latest news and updates from our team.
Don't worry, your information will not be shared.

We hate SPAM. We will never sell your information, for any reason.